Jun 25, 2025

Destini Secures MRT1 Sub-Contracts for HVAC and Brake System Overhaul

Engineering solutions provider Destini Bhd has secured two sub-contracts from SMH Rail Sdn Bhd to overhaul the HVAC systems and brake caliper equipment on 58 electric train sets operating on the MRT1 line. The sub-contracts, awarded through Destini's indirect subsidiary, Trovon Malaysia Sdn Bhd, will span 20 months, commencing in June 2025 and concluding in January 2027.

While the specific financial value of the contracts remains undisclosed, Destini anticipates that these projects will positively influence the group's earnings throughout the financial year ending June 30, 2025, and for the duration of the works. Destini's share price saw a positive movement, closing up 2.5 sen or 6.1% to 43.5 sen on Wednesday.

Share this Article

Share this Article

Share this Article

Women in Rail Malaysia Conference 2025: A Bold Vision for Inclusive and Intellig...

Jul 15, 2025

Women in Rail Malaysia Conference 2025: A Bold Vision for Inclusive and Intellig...

Jul 15, 2025

WWII-Era Trolley Rails Unearthed Near Penang's Fort Cornwallis

Jul 9, 2025

WWII-Era Trolley Rails Unearthed Near Penang's Fort Cornwallis

Jul 9, 2025

Kelana Jaya LRT Line Resumes Service Following Trespassing Incident

Jul 4, 2025

Kelana Jaya LRT Line Resumes Service Following Trespassing Incident

Jul 4, 2025

Women in Rail Malaysia Conference 2025: A Bold Vision for Inclusive and Intellig...

Jul 15, 2025

WWII-Era Trolley Rails Unearthed Near Penang's Fort Cornwallis

Jul 9, 2025

Kelana Jaya LRT Line Resumes Service Following Trespassing Incident

Jul 4, 2025

Typhoon Danas Disrupts Taiwan High-Speed Rail Schedule

Jul 6, 2025